Gov. DeSantis celebrates removal of Old Tamiami Trail blocking historic Everglades flow

Karl Schneider
Naples Daily News

For nearly a century, along the northwest corner of Miami-Dade County, Old Tamiami Trail served Florida’s tourists and indigenous tribes. Now in hopes of restoring the Everglades’ historic sheetflow of water, state agencies are working to remove it.

Just south of U.S. 41 near the Miccosukee Indian Village, the South Florida Water Management District is removing 5.5 miles of the unused highway to make way for fresh water flowing south from the heart of the Everglades — Lake Okeechobee.

The $7 million project was approved last summer, but crews had to wait until the area’s water levels dropped after the wet season to begin work.

An excavator removes roadbed from Old Tamiami Trail west of Miami on Tuesday, March 30, 2021. Florida Gov. Ron DeSantis and environmental officials attended a media event to highlight the project, part of the Comprehensive Everglades Restoration Plan, that includes the removal of five miles of roadbed from Old Tamiami Trail to help facilitate water flow back into the Everglades.

In case you missed it:Picayune Strand restoration efforts moving forward with road removal, canal plugging

More like this:Environmental restoration at home: Volunteers grow mangroves

On Tuesday, the district hosted Gov. Ron DeSantis and heads of various state agencies to witness the removal in action during a project celebration at the construction site.

“This is really an important milestone,” DeSantis said at the event. “It will improve the volume of water flowing south through the Everglades and support reducing harmful discharges from Lake Okeechobee to the Caloosahatchee and St. Lucie estuaries.”

The project is part of the overall Comprehensive Everglades Restoration Plan authorized in 2000. The project has been a partnership between the state of Florida and the U.S. Army Corps of Engineers.

DeSantis said that despite people saying the state’s budget would be a disaster, “we’re going to end up having a lot of success in this budget” for Everglades and water infrastructure funding.

In March, Florida’s representatives in the U.S. Congress asked President Joe Biden for $725 million, an increase from the $250 million in federal funding last year.

The roadbed removal is expected to increase the flow of freshwater into the northeast Shark River Slough by 220 billion gallons per year, DeSantis said.

Also:Corkscrew Swamp Sanctuary partners with water managers to restore wetlands

Gov. Ron DeSantis speaks during a media event to talk about the progress with the Central Everglades Restoration Plan, Tuesday, March 30, 2021, along Old Tamiami Trail in western Miami-Dade County.

“They tell me that this project is expected to be completed by January,” DeSantis said. “So, we’ll hold you to that and make sure that we continue working hard to be able to get that done.”

Noah Valenstein, secretary of the Florida Department of Environmental Protection, said during the event that Everglades restoration has hit a "battle rhythm" of getting things done.

“When water is not moving south, you have water moving to the estuaries. You don’t want it there,” Valenstein said. “You also have, I’ll mention, our tribal nations — when we have high water levels — are having flooding on their own homes. This is not acceptable, and we look forward to more water going south.”

When Old Tamiami Trail was built about 97 years ago, Miccosukee families moved out of the hammocks and set up near the highway to sell handmade toys to tourists as they traveled back and forth between Naples and Miami, Betty Osceola, a member of the Miccosukee, said.

More:State managers tackle water quality issues near Everglades restoration site

Seminole and Miccosukee guides helped the crews so long ago figure out the path the Trail would take to connect the two coasts, using dugout canoes to navigate the waters.

Now, the district is giving the leftover material from the road to the Miccosukee, who will use it to build additional homes on.

“It’s time for it to go and get a new life,” Osceola said.

Charlette Roman, board member of the district and chairwoman of the Big Cypress Basin board in Collier County, said Old Tamiami Trail acts as a dam, blocking water from moving into the Everglades and eventually into Florida Bay.

U.S. 41 has been raised in areas so water can flow under it near the Old Tamiami Trail project site, she said, and control structures help move that water into the park.

Chris Wittman, co-founder of Captains for Clean Water, attended the event.

“Every time we remove an impediment to sending water south it’s great,” Wittman said. “This will reconnect the natural system of the Everglades.”

Speaking last at the event was Pedro Ramos, the National Park Service’s superintendent of Everglades and Dry Tortugas parks.

“The Old Tamiami Trail has been an impediment to flow into Everglades National Park for 97 years,” Ramos said. “And it will be an impediment no more with all of this work we are doing here. This is a great day and the Everglades are smiling today.”

Karl Schneider is an environment reporter. Send tips and comments to kschneider@gannett.com. Follow on Twitter @karlstartswithk