Copy
AREA 4/5 Traffic Disruption
View this email in your browser

AREA 4

83 Street Between Argyll Road and 76 Avenue

Starting on or about July 23, 2020 EPCOR will be exposing conduit duct banks on 83 Street from Argyll Road to 76 Avenue. This overnight work will occur overnight, from 9:00 p.m. to 6:00 a.m.  To accommodate this work, the northbound lane will be closed to traffic between Argyll Road and 76 Avenue. Flaggers will be on hand to assist motorists. This work is expected to last two nights.

There will be hydrovacing associated with this work. A hydrovac is a machine that allows crews to safely excavate around pipes and gas lines without the danger of hitting them. Hydrovacs can be quite loud but they are the best tool for safe excavation.  TransEd is aware that overnight noise is disruptive and has taken several noise mitigation actions in advance of this work such as installing noise blankets ahead of the work beginning and reducing the use of back up alarms.

To accommodate this work, the public will be impacted in the following areas:

  • Closure of the northbound lane on 83 Street from Argyll Road to 76 Avenue.
  • There will be overnight noise associated with this work.
  • Pedestrian access will be maintained.
  • Flaggers will be on hand to assist traffic.

During this time please watch for, and follow, all traffic detours and direction of construction personnel.

TransEd is committed to following all City of Edmonton bylaws and regulations and has obtained an overnight roadwork permit so that work can take place during nighttime hours in order to minimize major daytime traffic disruptions. *City of Edmonton Bylaw C14600.

We ask for your understanding and patience as construction progresses. 

For the most current, up-to-date information in your area, please visit http://transedlrt.ca/updates/.  Please refer to the attached map for more details. For more information, visit our website http://transedlrt.ca or contact us via email at info@transedlrt.ca or by phone 780-224-0964.


AREA 4/5

83 Street From Argyll Road to 69A Avenue

Starting on or about July 24, 2020 crews will be commencing permanent curb and road construction on 83 Street between Argyll Road and 69A Ave. This work will take place during peak, off-peak, and overnight hours and is expected to last approximately three months. To accommodate this work, the northbound lane between Argyll Road and 69A Avenue will be shifted to the west side of the elevated guideway on 83 Street. 

There will be noise associated with this work and TransEd has taken several noise mitigation actions in advance of this work commencing.  Those actions include but are not limited to the installation of noise blankets ahead of the work beginning and reducing the use of back up alarms.

To accommodate this work, the public will be impacted in the following areas:

  • Northbound traffic on 83 Street from Argyll Road to 69A Avenue will be shifted west.
  • There will be noise associated with this work.
  • Pedestrian access will be maintained.

During this time please watch for, and follow, all traffic detours and direction of construction personnel.

TransEd is committed to following all City of Edmonton bylaws and regulations and has obtained an overnight roadwork permit so that work can take place during nighttime hours in order to minimize major daytime traffic disruptions. *City of Edmonton Bylaw C14600.

We ask for your understanding and patience as construction progresses. 

For the most current, up-to-date information in your area, please visit http://transedlrt.ca/updates/.  Please refer to the attached map for more details. For more information, visit our website http://transedlrt.ca or contact us via email at info@transedlrt.ca or by phone 780-224-0964.


Twitter
Facebook
Website
Copyright © 2020 TransEd Valley Line LRT, All rights reserved.


Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list