Category 1 Form 470 Filing Guide: Time to File for FY 2023!

November 17, 2022

Attached: Category 1 Form 470 Filing Guide FY 2023

~ Form 470 Filing Guide Attached ~

~ List of PA Applicants that May Need to File 470 for Recurring Services Available ~

The Form 470 marks the start of the FY 2023 funding year because it opens the competitive bidding process for equipment and services that aren’t yet under contract for FY 2023 (July 1, 2023 – June 30, 2024).  On the Form 470, schools and libraries identify and seek proposals for the products and services they need, and for which they will be requesting E-rate discounts, so that potential service providers can review those requests and submit proposals to you for consideration.  Attached is an updated Form 470 Filing Guide for Category 1 services that provides complete step-by-step screenshots showing how to complete the Form.  Category 2 eligibility and Form 470 filing instructions will follow.

FY 2023 Eligible Category 1 Services

Although the FCC has not yet formally adopted the FY 2023 Eligible Services List (ESL), their draft ESL contained no recommended changes for FY 2023.  As soon as the FCC approves the final ESL, USAC can announce the FY 2023 Form 471 window filing dates.

Understanding Which Form 470 Options to Select

Last year, the FCC modified the drop-down options to be descriptive options with progressive disclosures for Category 1 (meaning the form takes you to additional levels of questions, depending on the options you select).  To make the options a little more understandable, the attached Form 470 Filing Guide contains screenshots of the form with plain language annotations to help you select the appropriate option(s) – see slides 18-25.

When Must a Form 470 be Filed?

  1. If a service is covered on a Month-to-Month basis (meaning no contract), a new Form 470 is required annually (unless using the CABIO option).
  2. At the beginning of any new contract.  Note:  If you posted a Form 470 in a previous year, and then signed a multi-year contract that expires on or after June 30, 2024, you are not required to file a Form 470 for FY 2023.  If you wish to exercise a voluntary extension of a contract without posting a 470, you may only do so if your original contract contains the terms of the voluntary extensions (meaning the exact number of years or dates that the extensions can be exercised and it’s not just open-ended).  Otherwise, you must post a Form 470 to extend the contract.
  3. If you’re upgrading bandwidth mid-contract and the upgrades and associated prices are not included in the original contract (or making any other significant changes to your original contract).

Who Must File a Form 470 for FY 2023?

Based on the contract expiration date that you listed on your FY 2022 Form 471 and whether you indicated in the Contract Record whether the original contract contained optional extensions, I’ve created the FY 2023 Possible Category 1 Rebid List.  If you see that your contract expiration date (CED) is not accurate on the list, it likely means you entered it incorrectly on your FY 2022 Form 471.  If this happened, simply use the correct CED on your FY 2023 Form 471 and if PIA asks about the change, you can simply provide them with a copy of your contract that shows the accurate CED.

Help with Form 470 Narratives and RFPs

To further assist with what information you should include in an RFP or Form 470 narrative box, please refer to this helpful E-rate RFP and Form 470 Narrative Guide:  http://e-ratepa.org/wp-content/uploads/2014/03/8-5-RFP-Form-470-Narrative-Guide-FY-2023-PA-NEW.pdf.

Note: I encourage you to issue an RFP with your Form 470 to describe the services you want, minimum requirements for vendors, and possible disqualification factors, even if the RFP is just one-page.  Doing so will give you the ability to them upload any RFP addenda, Q & A, or additional information given to bidders using the ‘Related Actions’ feature in EPC when on the Form 470 page.  However, this can only happen if an RFP was uploaded with the 470 initially.  Important:  When any of the services or locations change, or if you provide additional, substantive information to bidders, you must provide this to all bidders using an RFP addendum and then be sure that the bid due date is at least 28 days after the posting of that new information.

Deadline to File Form 470
Although the very last possible date to file a 470 is 29 days before the 471 window closes, do not wait this long to file.  I encourage everyone to file their 470′s by the first week in December!  You will then receive vendor questions/proposals during the month of December, can evaluate your bids and select your vendors in January, have your board approve contracts in January or February (if required by local policy), and then sign your contracts and file your 471 in early March.

Important Requirements/Reminders:

  • List bid due date in Form 470 or RFP.  If such a deadline isn’t stated, you must consider all bids received up until the date you conduct your bid evaluation.  Therefore, I strongly recommend that all Form 470s/RFPs include a vendor proposal due date (be sure that this date is at least 29 days from the date this Form 470 is posted).
  • All disqualification reasons must be stated on the 470 or in the RFP
  • Upload RFP with 470

If you are using an RFP in addition to your 470, you must upload the RFP with the 470, AND upload any additional documentation given to bidders during the bidding process.  If any of the new documentation materially changes the services being bid or entities served, you must ensure the deadline to submit bids is at least 28-days after the RFP addendum is uploaded into EPC.  In light of this, you also may wish to consider adding 2 weeks to the 28-day clock to allow for initial vendor questions (set a deadline for those questions and then upload answers with the RFP).

  • Installment Payment Plan with vendors

If you would like to spread out the non-discounted (the applicant’s share) amount of the cost of special construction (installation), you must indicate so on the 470 under the ‘Payment Installation Plan’ section located beneath the narrative box.

  • Use State/Local Procurement Requirements narrative box

This is the space where you place instructions on bidders, such as the final date to submit bids (must be at least 29 days after 470 filing date), where to submit bids, in what format, if references are required, if vendors must have SPIN numbers, if you require discounted bills, etc.  Use this space wisely!


Hints for Form 470 Last Steps:

  • Viewing Draft 470 Before Filing

At the end of the form, the system will require you to select ‘Review 470’ and will say that it’s generating the PDF.  To see the PDF, you must click on ‘Refresh’ until it appears.  The PDF will not appear unless you click Refresh (and sometimes it takes up to 30 seconds to appear).  Review the draft and if you want to make changes to the form, click ‘Back to re-enter the form.  To submit, check on the certification box, and then ‘Continue to Certification’ to proceed with the certification/submission.

  • Obtaining a Final, Submitted Copy of Your 470

After you’ve “certified” your Form 470, it’s often difficult to find a final copy.  At the bottom of your Landing Page (home), scroll to the bottom where it says FCC Forms and Post-Commitment Requests.  Select ‘Form 470’ and the funding year.  Then click on the 470 Nickname that you gave the form and it will show you a summarized version of the 470.  To download an actual copy, click on ‘Generated Documents’ on the top toolbar, and then ‘Original Version.’

It’s important that you begin the Form 470 bidding process as soon as possible so you don’t run out of time during the Form 471 application window.   If you have any questions about filing the Form 470, please e-mail me at jtschell@comcast.net!

Happy Filing!

– Julie

Julie Tritt Schell

PA E-rate Coordinator

717-730-7133
jtschell@comcast.net
www.e-ratepa.org

 

Site graciously hosted by the Capital Area IU 15 | Site designed and maintained by Silver Penny Studio